Control
1. Implement ongoing measurement – How
will the process be measured after the project?
The process will controlled and measured using the Critical to Quality KPIs.
Control plans for KPIs
2. Standardise the decision making process – Have the
changes become business as usual?
Flow chart
3. Standardise the process
Standardise each component of the activity, Ensure the task
is allowed to flow. Keep documentation to a safe minimum. Paperwork is designed
to allow the job to progress, if it causes delays then the process needs to be
reviewed.
4. Quantify the improvement – Has the
project goal been achieved?
The project has identified that there are
cost/time/safety/environmental differences that can be attributed to both oil
change methods.
The conclusion of the project is that using the oil change
truck is the overall preferred option.